Wednesday was a day with many different things going on. In the morning Josh and Parke were finishing up sanding the ceilings (it is finally done), while I sent emails and made some phone calls. I also met a drywall guy over at the house and talked through everything I wanted done. He will get back to me soon with a price. After Josh and Parke finished sanding, they loaded up the truck with trash -- specifically old windows and pieces of wood -- and made several trips to the local dump. I also spent some time on Home Depot.com looking at bathroom mirrors, lighting, and trim.
Dave, the electrician, also worked on Wednesday and finished up everything that needed to be done before drywall work was done. This work included putting in boxes for smoke detectors in the hall and both bedrooms. The hallway box is shown below. Also shown are the scraped and sanded doors, which are ready to be touched up, primed, and painted.
No comments:
Post a Comment