Monday, November 22, 2010

Friday, 11/19 Deck Railing and Drywall

On Friday Johnny and I worked on the railing of the deck and the stairs. Cutting and putting up the balusters with a 4 inch spacing (thats what code requires) takes up most of a good day. Johnny and I spent all day on the deck, at the end of the day it was getting close to done. Parke worked inside doing some small drywall work. Some walls needed some small work.